What are the remote meter reading management to solve the problem of electricity consumption in the factory workshop?
1. Reduce the input of meter reading personnel: realize automatic meter reading, ease the labor intensity of meter reading personnel, reduce meter reading personnel, reduce preparation and reduce costs.
2. Reduce manual meter reading errors: As long as the remote meter reading is set up in the early stage, there will be basically no errors, unless the meter is abnormal, which greatly improves the work efficiency of the management department
3. Customization of energy-saving renovation plan: powerful data report, providing data and effect comparison before and after renovation for the company's energy-saving technology, and customization of renovation plan
4. Basis of energy cost trend: The manager has an accurate grasp of the proportion and trend of the energy cost of the enterprise, and decomposes the energy consumption planning task of the enterprise into the workshops of each production department, so that the responsibility for energy saving work is clear and promotes the healthy and stable development of the enterprise.
Factory workshop remote meter reading scheme
The factory floor meter reading is mainly divided into the information management layer and the metering equipment layer. There are also several remote meter reading communication solutions. We can talk about the characteristics of each meter reading solution separately, and customers can choose according to their own needs.
1. The most cost-effective RS485 meter reading communication solution
Scheme composition: RS-485 electric energy meter, acquisition equipment and system master station
Communication method: The upstream channel of the concentrator supports GPRS, Ethernet and other communication methods;
2. Support carrier connection collector to RS-485 communication mode
Solution advantages: low meter price, high data stability, fast transmission speed
Applicable places: houses, factories with many metering points, and meters are centrally installed in the meter box
3. Carrier meter reading solution without wiring
Scheme composition: smart energy meter, acquisition equipment and system master station
Communication method: The upstream channel of the concentrator supports GPRS, Ethernet and other communication methods;
4. Support carrier, micro-power wireless communication
Solution advantages: no wiring, fast installation, wireless transformation, just add a collector
Suitable place: Existing meter retrofit project
5. GPRS wireless meter reading communication scheme
Scheme composition: GPRS electric energy meter and system master station
Communication method: GPRS upload server
Solution advantages: no wiring, fast installation, low installation cost, strong expandability
Applicable places: factories, substations with few measuring points, scattered meter installation locations
Click smart energy meter, to view our smart energy meter products
Mother Company: Guangdong Super Telecom Co., Ltd. (Stock No. SH.603322)
Business Type: ISO 9001:2008 and ISO 14001:2004 certified Manufacturer
Main Products: Telecom SCADA; Energy Meter; RTU; Cabinet air conditioner; CRAC
Total Annual Revenue: US$ 14 Million-US$20 Million
Main Market: Asia, South America, Europe
Location: Chengdu, China (Panda’s homeland)
Year Established: 2010
R&D Achieves: 16 product patents; 6 software copyrights
You May Also Like
-
$707.00
-
-
$707.00
-